You don't have javascript enabled. Good luck with that.
Pencarian
 Pengecoran Tanggul Penahan Gelombang Pulau Untung Jawa Rampung
.
photo Suparni - Beritajakarta.id

Wave Barrier Repair on Untung Jawa Island Completed

Certainly this can reduce the risk of abrasion and tidal wave

The Thousand Islands Water Resources (SDA) Sub-agency has completed repair of the breakwater to absorb the energy of the waves that hit it on the north side of Untung Jawa Island, Untung Island Jawa Urban Village, South Thousand Islands Sub-district.

The barrier stretches for 422 meters covering the areas of RT 01/03, RT 02/02 and RT 03/03. This repair project includes, reinstalling the cube, installing wire gabions and casting the top of the barrier.

Eleven Breakwater Embankments on Residential Islands Installed

Thousand Islands SDA Sub-agency Head Abdul Rouf said, the barrier collapsed after being hit by waves last June.

"Then we immediately repaired it in stage by sending 24 personnel and it was finished last month," he told.

By so, the settlements on Untung Jawa Island would be safe from waves that might trigger inundation or flooding.

"Certainly this can reduce the risk of abrasion and tidal wave," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye939 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye928 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye768 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye592 personBudhi Firmansyah Surapati