You don't have javascript enabled. Good luck with that.
Pencarian
 Pengecoran Tanggul Penahan Gelombang Pulau Untung Jawa Rampung

Wave Barrier Repair on Untung Jawa Island Completed

Certainly this can reduce the risk of abrasion and tidal wave

The Thousand Islands Water Resources (SDA) Sub-agency has completed repair of the breakwater to absorb the energy of the waves that hit it on the north side of Untung Jawa Island, Untung Island Jawa Urban Village, South Thousand Islands Sub-district.

The barrier stretches for 422 meters covering the areas of RT 01/03, RT 02/02 and RT 03/03. This repair project includes, reinstalling the cube, installing wire gabions and casting the top of the barrier.

Eleven Breakwater Embankments on Residential Islands Installed

Thousand Islands SDA Sub-agency Head Abdul Rouf said, the barrier collapsed after being hit by waves last June.

"Then we immediately repaired it in stage by sending 24 personnel and it was finished last month," he told.

By so, the settlements on Untung Jawa Island would be safe from waves that might trigger inundation or flooding.

"Certainly this can reduce the risk of abrasion and tidal wave," he stated.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye788 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye626 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye620 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye361 personNurito